Power Energy Cyprus (PEC) with consideration to the increasing energy consumption demand and to the planned electricity market liberalisation, has acquired all the necessary permits and begun construction of a state-of-the-art Combined Cycle Power Plant.
Mari Power plant will use the latest technology in power generation. It will be a gas fired combined cycle power plant but will also be operated with diesel if necessary. The 260 MW Power Station will contribute to the reduction of electricity cost for end-users and will serve the vision of becoming a leading Energy Supplier in the Island.
We are currently seeking qualified candidates for the position of Electrical Engineering Coordinator. The successful candidate will report to the Engineering and Project Director and will be part of the Project Management Team. This is a staff position based in Nicosia for the engineering phase. Relocation to Mari, Limassol will be required for the later part of the project, mainly during the Commissioning phase. Potential long term management position during the Operation and Maintenance Phase.
An attractive remuneration package based on qualifications and experience, including benefits and allowances. Excellent working conditions in a professional environment with great career development opportunities.
Cyfield Group is an equal opportunity employer that actively supports equality, diversity and inclusion and encourages applications from all qualified professionals. All applications will be treated confidentially according to the laws of the Data Protection and only those which meet the requirements shall be replied to due to the high volume of applications.